Metnor | Kingston | 5 Samson Hardidecks

Metnor need access to 5 levels of their concrete framed structure which at the time were not reachable by crane.  As fit out was occuring simultaniously with facade work it was vital that as much of the building could be closed up as possible.  Metnor therefore required loading platforms to be stacked vertically, Hardideck was the perfect option providing both the flexibility of a retractable platform with the flush to floor benefits of a fixed deck so that the bathroom pods due to be installed could be transported easily into the structure.

Bathroom PODS have been arriving reguarly every Friday since installation and the Hardidecks have helped msasively.

By | 2016-10-17T08:24:56+00:00 October 4th, 2016|Categories: Loading Platforms|0 Comments