Admin

/Admin

About Admin

This author has not yet filled in any details.
So far Admin has created 8 blog entries.

PodLifter | Sisk | Lewisham Gateway

By | September 4th, 2017|Categories: POD Lifter|Tags: , , , , , , , , , , , , , , , , , , |

SITE:  LEWISHAM GATEWAY PRINCIPLE CONTRACTOR: SISK PROJECT BRIEF:  Principle Contractor Sisk needed a fast and safe solution for lifting and installing prefabricated bathroom pods into a 23 storey residential block in Lewisham. The need for speed together with the close proximity of an existing building meant using a cantilever [...]

SAMSON EQUIPMENT | BIN CAGE

By | August 8th, 2017|Categories: Crane Attachments|Tags: , , , , , , , , |

SITE:  CHELSEA PRINCIPLE CONTRACTOR: JRL MIDGUARD PROJECT BRIEF:  JRL – Midgard needed a fast and safe solution for the removal of waste from it’s multi-floor project in the heart of Chelsea. Already in use on the project were a number of plastic wheelie bins for transferring waste from the floors to the [...]

Cidon Construction | Port Street | Manchester

By | August 3rd, 2017|Categories: Loading Platforms|Tags: , , , , , , , , , |

SITE:  Port Street PRINCIPLE CONTRACTOR: Cidon PROJECT BRIEF:  When Cidon Construction urgently needed 2 bespoke sized cantilever loading platforms for their Port St project in Manchester, they came to Samson Equipment, the experts in bespoke lifting and access solutions for high rise construction. Not only were we able to engineer the extra [...]

MACE | Atlas Building | City Road | London

By | July 22nd, 2017|Categories: Loading Platforms, POD Lifter|Tags: , , , , |

SITE:  ATLAS BUILDING, CITY ROAD, LONDON PRINCIPLE CONTRACTOR: MACE PROJECT BRIEF:  Toprovide 3 No bespoke  PodLifter cages for the lifting and sideways installation of pre-fabricated bathroom pods into the iconic 44 storey Atlas building in the heart of London’s booming tech industry. Bathpod Installations UK Ltd in conjunction with principle contractor [...]

Plant Movements Ltd | Greenwich Peninsular

By | October 17th, 2016|Categories: POD Lifter|Tags: , , , , , , , |

When the UK’s leading plant handling company, Plant Movements Ltd won the contract to lift and install over 450 prefabricated bathroom pods into a brand new riverside hotel in Greenwich without using crane loading platforms, they immediately contacted Samson for a solution. We were able to design, fabricate and supply in record time 2 bespoke Podlifter [...]

Metnor Construction – Newcastle

By | October 13th, 2016|Categories: Crane Attachments, POD Lifter|

(Click image for more) When it came to choosing a loading system for the fit out of a steel framed student accommodation block in Newcastle upon Tyne, Metnor Construction were impressed by the versatility that the Hardideck platform from Samson Equipment would provide. The ability to relocate the Outboard section of the Hardideck quickly and easily [...]

Metnor – Kingston

By | October 4th, 2016|Categories: Loading Platforms|

Metnor | Kingston | 5 Samson Hardidecks Metnor need access to 5 levels of their concrete framed structure which at the time were not reachable by crane.  As fit out was occuring simultaniously with facade work it was vital that as much of the building could be closed up as possible.  Metnor therefore required loading platforms [...]